A Singapore Government Agency Website How to identify
X

Public Works and Future Plans for Former Railway Land

Home > Articles > Press Releases > 2011 > Public Works and Future Plans for Former Railway Land
URA logo  SLA logo

Joint News Release

 

1 July 2011      The lands previously occupied by Keretapi Tanah Melayu (KTM) for railway use have been vested in the Singapore Government with effect from 1 July 2011.

As agreed with Malaysia, Singapore will remove the tracks and ancillary structures of the KTM railway and hand them over to Malaysia. The Singapore Land Authority (SLA) will commence these removal works as well as conduct maintenance works around the various railway sites shortly.

Public Can Access the Railway Tracks

Nevertheless, in response to requests for an opportunity for the public to trek along and experience the tracks, the SLA will be staging its works. From 1 Jul 2011 to 17 Jul 2011, the entire line of railway tracks will be open to public for 2 weeks, except for some localised areas.

After 17 Jul 2011, a 3km stretch of railway tracks from Rifle Range Road to the Rail Mall will continue to be open to the public till 31 Jul 2011.

As the railway tracks can be narrow and rough at certain locations, members of the public are advised to exercise caution when walking along the track.

The Tanjong Pagar Railway Station and Bukit Timah Railway Station will be closed temporarily to facilitate the moving out of the furniture and equipment by the KTM and its tenants. SLA will also carry out maintenance works and structural inspection. More information on their re-opening will be provided to the public in due course.

Removal Works along the Railway Tracks

From 1 Jul to 17 Jul 2011, minor works will be carried out at the Bukit Timah Railway Station and the railway crossings at Kranji Road, Sungei Kadut Avenue, Choa Chu Kang Road, Stagmont Ring, and Gombak Drive. Members of the public should avoid these work areas which will be cordoned off.

Works to remove the railway tracks along the rest of the former railway line, except for the 3km stretch from Rifle Range Road to the Rail Mall, will commence from 18 July 2011. The removal works include the clearance of minor buildings, sleepers, tracks, cables, gates, posts and debris around the various sites from Tanjong Pagar to Woodlands. Other items to be removed include railway equipment, such as signal lights, level crossings, controllers and traffic lights. The removal works are to be fully completed by 31 December 2011.

Due to these extensive removal works, the affected areas will be secured and cordoned off. For safety reasons, members of the public are advised to keep away from these areas whilst the removal works are ongoing.

Public Feedback Sought

The Urban Redevelopment Authority (URA) will comprehensively review and chart the development plans for the former railway lands and their surrounding areas. As part of its review, the URA will study the possibility of marrying development and conservation, such as applying innovative strategies to maintain a continuous green link along the rail corridor without affecting the development potential of the lands.

The URA welcomes feedback and ideas from the community in shaping the future development plans for the railway lands. The members of the public are invited to visit and provide their ideas at www.ura.gov.sg/railcorridor.

– End –

Issued by:
Singapore Land Authority & Urban Redevelopment Authority
1 July 2011